On April 26, 2021, the bow section of the barge made by the Szczecin Shipyard „Wulkan” was transported.
Scope of work: construction of the steel structure of the section with a weight of 166.5 T.
On April 26, 2021, the bow section of the barge made by the Szczecin Shipyard „Wulkan” was transported.
Scope of work: construction of the steel structure of the section with a weight of 166.5 T.